| |
INTRODUCTION
The Standard of IPKIN's Competencies For System Analyst, Programmer and
Project Manager, Entrepreneurship Spirit System and Software Engineering
Development Life Cycle (SDLC and SEDLC).
PROJECT PROPOSAL DESIGN
Why Build Software in-House. Arrange The Persuasive Information System Project
Proposal. Arrange The MoU Between Parts. Negotiation Power. Software Prototypes.
SYSTEM ANALYSIS AND DESIGN
Core of System Analysis: Data Dictionary, Entity Relationship Model, Data
Flow Diagram, Relational Database Management System, Transition to System
Design. Core of System Design: Consideration of System Design, Prototyping
Method, Prototype Generator Tools, Human-Computer Interaction, User Centered
Interface, User Interface Design, User Interface Controls. Transition to
System Programming.
DATABASE ADMINISTRATOR
Prepare and Configure Windows XP and 2003 Network Connection, Configure
MySQL Front Server: Server Connection. User Management: Create Database,
Table, and Table Diagnostics. Query Management: SQL Statements.
SYSTEM PROGRAMMING
Building The Physical Model, Split The Project to Modules, Information System.
Model: Input Design, Data Entry Screen Design. Source Document, Input Error,
Input Controls. Output Design, Report Design: Type of Reports, Output Security
and Controls.
SYSTEM IMPLEMENTATION AND TESTING
Basic of Software Testing: Definition, Test Cases, Success Testing, White
Box and Black Box Approaches. Attributes of Good Testing. System Testing
Strategy: Validation, Verification. Spiral Model: Unit Test Procedures and
Consideration. Integration Test: Top-Down, Bottom-Up. Validation Test: Alpha
and Beta Test. System Test: Security Test, Stress Test, Performance Test.
Debugging: Definition, Procedures and Characteristics of Bug.
SYSTEM MAINTENANCE
Purpose of Maintenance. Remote Maintenance Technique: File Transfer Technique:
Remote Access Service (RAS), File Transfer Protocol (FTP), Virtual Private
Netware (VPN), Electronic Mail (E-Mail), Local Area Network (LAN). Remote
Assistance: Remote Desktop, Terminal Service and Teleconference Configuring
LapLink Gold for RAS and File Transfer.Writing User's Guide and Preparing
for End-User Training.
TEAM WORK
Job Distribution, Speed to Solve The Problems, Program Logics, Skill to
Use Development Tools, Time and Stress Management, Psychology. Science Knowledge
Spectrum, Hardware Configuration Skill.
|
|